Cordwood Construction

Monday, 14 May 2012

Construction Drawing


Posted by Design Students at 21:06
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2012 (8)
    • ▼  May (6)
      • Conclusion
      • Deconstructing wall
      • Timber selection
      • Rainwater Test
      • Construction Begins
      • Construction Drawing
    • ►  April (2)

About Me

My photo
Design Students
View my complete profile
Eddie. Awesome Inc. theme. Powered by Blogger.